Journal of Construction Engineering and Management - v. 110, n. 1 (mars 1984)
Publié: | mars 1984 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Suckarieh, George | Construction Management Control with Microcomputers | 72-78 |
Stukhart, George | Contractual Incentives | 34-42 |
Saxena, S. K. / Lourie, David E. / Shah, N. S. / Singhal, K. | Equipment Cost Analysis for Waste Embankments | 60-71 |
Herbsman, Zohar / Mitrani, J. D. | INES—An Interactive Estimating System | 19-33 |
Ibbs, C. William / Terveer, Kenneth R. | Integrated Construction Preventive Maintenance System | 43-59 |
Carino, Nicholas J. / Lew, H. S. / Stone, William C. | Investigation of East Chicago Ramp Collapse | 1-18 |
Tenah, Kwaku A. | Management Information Organization and Routing | 101-118 |
Karshenas, Saeed | Predesign Cost Estimating Method for Multistory Buildings | 79-86 |
Diekmann, James E. / Peppler, Scott E. | Union and Open Shop Labor Cost Differences | 87-99 |