Engineering, Construction and Architectural Management - v. 25, n. 4 (mai 2018)
Publié: | mai 2018 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Akbari, Saeed / Khanzadi, Mostafa / Gholamian, Mohammad Reza | Building a rough sets-based prediction model for classifying large-scale construction projects based on sustainable success index | 534-558 |
Shahsavand, Parvaneh / Marefat, Akbar / Parchamijalal, Majid | Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol | 497-533 |
Ismail, Zul-Atfi Bin | Improving contractor social networking on IBS infrastructure maintenance projects: a review | 479-496 |
Mahjoubpour, Behzad / Nasirzadeh, Farnad / Mohammad Hosein Zadeh Golabchi, Mahmoud / Ramezani Khajehghiasi, Maryam / Mir, Mostafa | Modeling of workers’ learning behavior in construction projects using agent-based approach: The case study of a steel structure project | 559-573 |
Li, Jue / Yu, Minghui / Wang, Hongwei | A taxonomy of performance shaping factors for shield tunnel construction | 574-596 |