Engineering, Construction and Architectural Management - v. 22, n. 2 (mars 2015)
Publié: | mars 2015 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Salah, Ahmad / Moselhi, Osama | Contingency modelling for construction projects using fuzzy-set theory | 214-241 |
Aibinu, Ajibade A. / Dassanayake, Dharma / Chan, Toong-Khuan / Thangaraj, Ram | Cost estimation for electric light and power elements during building design: A neural network approach | 190-213 |
Ling, Florence Y. Y. / Tan, Peng Chong / Ning, Yan / Teo, Albert / Gunawansa, Asanga | Effect of adoption of relational contracting practices on relationship quality in public projects in Singapore | 169-189 |
Rajeh, Mohammed / Tookey, John E. / Rotimi, James Olabode Bamidele | Estimating transaction costs in the New Zealand construction procurement: A structural equation modelling methodology | 242-267 |
Singh, Vishal / Holmström, Jan | Needs and technology adoption: observation from BIM experience | 128-150 |
Alharbi, Mohammed / Emmitt, Stephen / Demian, Peter | What is architectural management? Towards a pragmatic definition | 151-168 |