Engineering, Construction and Architectural Management - v. 19, n. 4 (juin 2012)
Publié: | juin 2012 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Oluwatayo, Adedapo / Amole, Dolapo | Characteristics of global architectural firms | 393-405 |
Dursun, Onur / Stoy, Christian | Determinants of construction duration for building projects in Germany | 444-468 |
Liu, Yang / Mohamed, Yasser | Modelling industrial construction operations using a multi‐agent resource allocation framework | 406-427 |
De Silva, Nayanthara / Wimalaratne, P. L. I. | OSH management framework for workers at construction sites in Sri Lanka | 369-392 |
Chong, Heap‐Yih / Zin, Rosli Mohamad | Selection of dispute resolution methods: factor analysis approach | 428-443 |
Bemelmans, Jeroen / Voordijk, Hans / Vos, Bart | Supplier‐contractor collaboration in the construction industry: A taxonomic approach to the literature of the 2000‐2009 decade | 342-368 |