Engineering, Construction and Architectural Management - v. 18, n. 3 (mai 2011)
Publié: | mai 2011 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Abdul‐Aziz, Abdul‐Rashid / Wong, Sing‐Sing | Business networks and internationalisation of contractors from developing countries: An explorative study | 282-296 |
Ilhan, Bahriye / Yaman, Hakan | A comparative input‐output analysis of the construction sector in Turkey and EU countries | 248-265 |
Mitchell, Adrian / Frame, Ian / Coday, Alan / Hoxley, Mike | A conceptual framework of the interface between the design and construction processes | 297-311 |
Tan, Yongtao / Shen, Li‐Yin / Langston, Craig | A fuzzy approach for assessing contractors' competitiveness | 234-247 |
Leung, Mei‐Yung / Shan Isabelle Chan, Yee / Dongyu, Chen | Structural linear relationships between job stress, burnout, physiological stress, and performance of construction project managers | 312-328 |
Mohamed, Sherif / Chinda, Thanwadee | System dynamics modelling of construction safety culture | 266-281 |