Engineering, Construction and Architectural Management - v. 18, n. 2 (mars 2011)
Publié: | mars 2011 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Sebastian, Rizal | Changing roles of the clients, architects and contractors through BIM | 176-187 |
Lingard, Helen / Cooke, Tracy / Blismas, Nick | Coworkers' response to occupational health and safety: An overlooked dimension of group‐level safety climate in the construction industry? | 159-175 |
Kikwasi, Geraldine John | An evaluation of construction skills in Tanzania | 127-139 |
Chan, Daniel W. M. / Lam, Patrick T. I. / Chan, Albert P. C. / Wong, James M. W. | Guaranteed maximum price (GMP) contracts in practice: A case study of a private office development project in Hong Kong | 188-205 |
Balatbat, Maria C. A. / Lin, Cho‐yi / Carmichael, David G. | Management efficiency performance of construction businesses: Australian data | 140-158 |
Hastheetham, Arthasith / Hadikusumo, Bonaventura H. W. | Theoretical framework of strategic behaviors in Thai contractors: An empirical case study | 206-225 |