Engineering, Construction and Architectural Management - v. 15, n. 3 (mai 2008)
Publié: | mai 2008 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Hassanein, Amr A. G. / El Nemr, Waleed | Claims management in the Egyptian industrial construction sector: A contractor's perspective | 246-259 |
Mansfield, John R. | The ethics of conservation: some dilemmas in cultural built heritage projects in England | 270-281 |
Manley, Karen | Implementation of innovation by manufacturers subcontracting to construction projects | 230-245 |
Bowen, Paul / Cattell, Keith | Job satisfaction of South African quantity surveyors | 260-269 |
Nguyen, T. H. / Shehab, T. / Gao, Z. | Selecting an architecture‐engineering team by using fuzzy set theory | 282-298 |
Toor, Shamas‐Ur‐Rehman / Ofori, George | Tipping points that inspire leadership: An exploratory study of emergent project leaders | 212-229 |