Engineering, Construction and Architectural Management - v. 9, n. 2 (février 2002)
Publié: | février 2002 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Singh, Amarjit | Behavioural perceptions of design and construction engineers | 66-80 |
Xiao, Hong / Proverbs, David | Construction time performance: an evaluation of contractors from Japan, the UK and the US | 81-89 |
Skitmore, Martin / Lo, H. P. | A method for identifying high outliers in construction contract auctions | 90-130 |
Rahman, M. Motiar / Kumaraswamy, M. M. | Risk management trends in the construction industry: moving towards joint risk management | 131-151 |
Sarshar, Marjan / Tanyer, A. Murat / Aouad, Ghassan / Underwood, Jason | A vision for construction IT 2005–2010: two case studies | 152-160 |