Engineering, Construction and Architectural Management - v. 7, n. 1 (janvier 2000)
Publié: | janvier 2000 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Kumar, Vellanki S. S. / Hanna, Awad S. / Adams, Teresa | Assessment of working capital requirements by fuzzy set theory | 93-103 |
Alarcón, L. F. / Bastias, A. | A computer environment to support the strategic decision‐making process in construction firms | 63-75 |
Hong Loh, Woon / Ofori, George | Effect of registration on performance of construction subcontractors in Singapore | 29-40 |
Kamara, J. M. / Anumba, C. J. / Evbuomwan, N. F. O. | Establishing and processing client requirements—a key aspect of concurrent engineering in construction | 15-28 |
Edwards, David J. / Holt, Gary D. | ESTIVATE: a model for calculating excavator productivity and output costs | 52-62 |
Huang, Rong‐Yau / Halpin, Daniel W. | Graphically based LP modelling for linear scheduling analysis: the POLO system | 41-51 |
Naoum, Shamil / Haidar, Ali | A hybrid knowledge base system and genetic algorithms for equipment selection | 3-14 |
Li, Heng / Cheng, Eddie W. L. / Love, Peter E. D. | Partnering research in construction | 76-92 |