Earthquake Engineering and Structural Dynamics - v. 36, n. 2 (février 2007)
Publié: | février 2007 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Dastous, Jean-Bernard | Guidelines for seismic design of flexible buswork between substation equipment | 191-208 |
Xu, Ningxiong / Guikema, Seth D. / Davidson, Rachel A. / Nozick, Linda K. / Çağnan, Zehra / Vaziri, Kabeh | Optimizing scheduling of post-earthquake electric power restoration tasks | 265-284 |
Shumuta, Yoshiharu | Practical seismic upgrade strategy for substation equipment based on performance indices | 209-226 |
Song, Junho / Der Kiureghian, Armen / Sackman, Jerome L. | Seismic interaction in electrical substation equipment connected by non-linear rigid bus conductors | 167-190 |
Shinozuka, M. / Dong, X. / Chen, T. C. / Jin, X. | Seismic performance of electric transmission network under component failures | 227-244 |
Dueñas-Osorio, Leonardo / Craig, James I. / Goodno, Barry J. | Seismic response of critical interdependent networks | 285-306 |
Nuti, Camillo / Rasulo, Alessandro / Vanzi, Ivo | Seismic safety evaluation of electric power supply at urban level | 245-263 |