Construction Management and Economics - v. 6, n. 4 (décembre 1988)
Publié: | décembre 1988 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Runeson, G. | An analysis of the accuracy of estimating and the distribution of tenders | 357-370 |
Laufer, A. / Tucker, R. L. | Competence and timing dilemma in construction planning | 339-355 |
Shtub, Avraham | The integration of CPM and material management in project management | 261-272 |
Pain, James / Bennett, John | JCT With Contractor's Design form of contract: a study in use | 307-337 |
Ndekugri, Issaka E. / McCaffer, Ronald | Management information flow in construction companies | 273-294 |
Touran, Ali / Taher, Khalid A. H. | Optimum fleet size determination by queuing and simulation | 295-306 |