Construction Management and Economics - v. 2, n. 2 (septembre 1984)
Publié: | septembre 1984 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Brandon, Peter S. | Cost versus quality: a zero sum game? | 111-126 |
Ofori, George | Improving the construction industry in declining developing economies | 127-132 |
Furusaka, Shuzo / Gray, Colin | A model for the selection of the optimum crane for construction sites | 157-176 |
Edwards, Ben / Eckblad, John | Motivating the British construction industry | 145-156 |
Walker, A. / Hughes, W. P. | Private industrial project management: a systems-based case study | 93-110 |
Cherns, Albert B. / Bryant, Donald T. | Studying the client's role in construction management | 177-184 |
Gray, C. / Flanagan, R. | US productivity and fast tracking starts on the drawing board | 133-144 |