Built Environment Project and Asset Management (BEPAM) - v. 1, n. 2 (novembre 2011)
Publié: | novembre 2011 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Singh, Amarjit | Bayesian analysis for causes of failure at a water utility | 195-210 |
Ling, Florence Yean Yng / Tat Ng, Wee | Boosting performance of road infrastructure: A case study based on motorist satisfaction in Singapore | 211-225 |
Kishor Mahato, Braj / Ogunlana, Stephen O. | Conflict dynamics in a dam construction project: a case study | 176-194 |
Deshmukh, Abhijeet / Oh, Eun Ho / Hastak, Makarand | Impact of flood damaged critical infrastructure on communities and industries | 156-175 |
Madritsch, Thomas / Ebinger, Matthias | A management framework for the built environment: BEM2/BEM3 | 111-121 |
Raphael, Benny | Multi‐criteria decision making for collaborative design optimization of buildings | 122-136 |
Xu, Ming / Duffield, Colin / Ma, Jianqin | Performance of mid‐project reviews (MPRs): quantification based on fuzzy recognition | 137-155 |