Automation in Construction - juin 2017
Publié: | juin 2017 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Wei, Haitao / Zheng, Shunyi / Zhao, Like / Huang, Rongyong | BIM-based method calculation of auxiliary materials required in housing construction | 62-82 |
Pandžić, Jelena / Pejić, Marko / Božić, Branko / Erić, Verica | Error model of direct georeferencing procedure of terrestrial laser scanning | 13-23 |
Nadal, Adolfo / Cifre, Hugo / Pavón, Juan / Liébana, Óscar | Material use optimization in 3D printing through a physical simulation algorithm | 24-33 |
Boxer, Eric / Henze, Gregor P. / Hirsch, Adam I. | A model-based decision support tool for building portfolios under uncertainty | 34-50 |
Li, Gang / Zhao, Xiaoxing / Du, Kai / Ru, Feng / Zhang, Yubo | Recognition and evaluation of bridge cracks with modified active contour model and greedy search-based support vector machine | 51-61 |
Abbasian-Hosseini, S. Alireza / Liu, Min / Hsiang, Simon M. | Social network conformity and construction work plan reliability | 1-12 |