Automation in Construction - v. 12, n. 3 (mai 2003)
Publié: | mai 2003 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Yagi, Junichi / Arai, Eiji / Shirase, Keiichi / Matsumoto, Shinji | Action-based union of the temporal opposites in scheduling: non-deterministic approach | 321-329 |
Cheung, Sai On / Suen, Henry C. H. / Cheung, Kevin K. W. | An automated partnering monitoring system—Partnering Temperature Index | 331-345 |
van der Aalst, W. M. P. / Stoffele, M. / Wamelink, J. W. F. | Case handling in construction | 303-320 |
Fan, Su-Ling / Tserng, H. P. / Wang, Ming-Teh | Development of an object-oriented scheduling model for construction projects | 283-302 |
Cheng, Tao-ming / Feng, Chung-Wei | An effective simulation mechanism for construction operations | 227-244 |
Ko, Chien-Ho / Cheng, Min-Yuan | Hybrid use of AI techniques in developing construction management tools | 271-281 |
Budny, Eugeniusz / Chłosta, Mirosław / Gutkowski, Witold | Load-independent control of a hydraulic excavator | 245-254 |
Zhu, Yimin / Issa, Raja R. A. | Viewer controllable visualization for construction document processing | 255-269 |