0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

West Gate Bridge Strengthening Project - Context and Project Objectives

 West Gate Bridge Strengthening Project - Context and Project Objectives
Auteur(s):
Présenté pendant 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012, publié dans , pp. 857-862
DOI: 10.2749/222137912805111302
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.14 MB

In 2006 the Victorian Government announced funding to carry out essential strengthening of the West Gate Bridge to ensure that it was able to continue to perform its critical function within the St...
Lire plus

Détails bibliographiques

Auteur(s):
Médium: papier de conférence
Langue(s): anglais
Conférence: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012
Publié dans:
Page(s): 857-862 Nombre total de pages (du PDF): 6
Page(s): 857-862
Nombre total de pages (du PDF): 6
DOI: 10.2749/222137912805111302
Abstrait:

In 2006 the Victorian Government announced funding to carry out essential strengthening of the West Gate Bridge to ensure that it was able to continue to perform its critical function within the State’s transport network. The strengthening project was to be planned and carried out over a 10 year period consistent with the approach adopted for the strengthening of similar bridges elsewhere in the world.

At the same time, and independent of the announcement regarding West Gate Bridge, the Government entered into a contract to complete a $1.5bn upgrade of the Monash-CityLink-West Gate (M1) Freeway over a length of 75km either side of the West Gate Bridge. This much broader project was to be delivered within 5 years, including essential works across West Gate Bridge.

Consequently the strengthening project had to be compressed into a much shorter time frame than had been achieved anywhere else, with analysis, design and construction completed within three and a half years - while the Bridge continued to carry up to 160,000 vehicles each day.

This paper discusses the complex history of the West Gate Bridge, the objectives of the strengthening project and how they fitted into the overall context of the M1 Upgrade project, the formation of the West Bridge Strengthening Alliance to design and carry out the strengthening works, and what the outcome has been for the State of Victoria and the future of the Bridge.

Mots-clé:
renforcement

Ouvrages et projets