Warta River crossing 130 m of ready construction per week with a crowing achievement – extradosed bridge
|
Détails bibliographiques
Auteur(s): |
Andrzej Berger
Marcin Lewandowski Adam Nadolny Jerzy Onysyk Krzysztof Sadowski (Wroclaw University of Technology, Wrocław, PL) Paweł Hawryszków (Wroclaw University of Technology, Wrocław, PL) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008 | ||||
Publié dans: | IABSE Congress Chicago 2008 | ||||
|
|||||
Page(s): | 608-609 | ||||
Nombre total de pages (du PDF): | 7 | ||||
Année: | 2008 | ||||
DOI: | 10.2749/222137908796294199 | ||||
Abstrait: |
The Warta is a medium size river in central Poland. The project of the Warta river crossing was connected with the project of the town ring road of Konin. The crossing was divided into four independent structures: three flyovers E5, E7, E8 and the main bridge. All structures were designed for two roads. |