Verification of three FEM programs in the analyses of a highway bridge
|
Détails bibliographiques
Auteur(s): |
Zoltán Teiter
Bertalan Szabó Aarne Jutila |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013 | ||||
Publié dans: | IABSE Conference, Rotterdam, May 2013 | ||||
|
|||||
Page(s): | 124-125 | ||||
Nombre total de pages (du PDF): | 5 | ||||
Année: | 2013 | ||||
DOI: | 10.2749/222137813806474499 | ||||
Abstrait: |
The paper contains a verification of three FEM programs and different standards used in the design of a highway bridge in Hungary. The main span consists of a Langer-girder with 100 m span. The softwares used during the analysis are RM Bridge, LUSAS and Sofistik. These programs are suitable for the design of major bridges. |
||||
Mots-clé: |
pont Eurocode Structure composite arc
|