0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Upgrading of three historic arch bridges over the Orange River near Keimoes, South Africa

 Upgrading of three historic arch bridges over the Orange River near Keimoes, South Africa
Auteur(s): , , ,
Présenté pendant IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, publié dans , pp. 1260-1267
DOI: 10.2749/222137814814067824
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.11 MB

This project is located on the South African National Roads Agency SOC Ltd’s (SANRAL’s) Route R27 near Keimoes in the Northern Cape Province of South Africa. The overall objective was to improve t...
Lire plus

Détails bibliographiques

Auteur(s):



Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Publié dans:
Page(s): 1260-1267 Nombre total de pages (du PDF): 8
Page(s): 1260-1267
Nombre total de pages (du PDF): 8
Année: 2014
DOI: 10.2749/222137814814067824
Abstrait:

This project is located on the South African National Roads Agency SOC Ltd’s (SANRAL’s) Route R27 near Keimoes in the Northern Cape Province of South Africa. The overall objective was to improve traffic capacity and safety of the route, with the main focus being the widening of four single traffic lane bridges over the Orange River floodplain. This paper reviews the upgrading of the three main historic arch bridges.

The project included a detailed hydrological and hydraulic assessment which resulted in the raising of two of the structures by approximately 2,5m to prevent overtopping of the structures during larger flood events. The largest of the three bridges, a ten span arch bridge, was at a higher level and the existing deck was therefore retained and widened. The raising and/or widening of the bridges had to comply with heritage requirements as these structures, completed in the early 1930’s, have significant historical importance. This resulted in the original form and appearance to be retained by using a similar arch configuration and detailing. Construction was completed in 2013.

Mots-clé:
esthétique

Lieux géographiques