0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Track Transition on Bridges or Switch-Over Ramps: Rail Based Urban Transport

 Track Transition on Bridges or Switch-Over Ramps: Rail Based Urban Transport
Auteur(s): ,
Présenté pendant IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, publié dans , pp. 513-521
DOI: 10.2749/nanjing.2022.0513
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.19 MB

With rapid urbanisation, pressures on the urban transport facilities have increased manyfold for reasons of ever increased population and demands for better living. Rail based Mass Rapid Transit Sy...
Lire plus

Détails bibliographiques

Auteur(s): (FNAE, Hon. Member & Fellow, and Former Vice President, IABSE, F.I.Struct.E. (UK))
(Principal Engineer Track, DB Engineering & Consulting GmbH, Bengaluru, India)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Publié dans:
Page(s): 513-521 Nombre total de pages (du PDF): 9
Page(s): 513-521
Nombre total de pages (du PDF): 9
DOI: 10.2749/nanjing.2022.0513
Abstrait:

With rapid urbanisation, pressures on the urban transport facilities have increased manyfold for reasons of ever increased population and demands for better living. Rail based Mass Rapid Transit Systems (MRTS) be it elevated or underground was the first choice of the Indian Cities, which is changing now with more and more interest coming from 2nd and 3rd Tier Cities, Light Rail Transit System (LRTS) and trolley bus is gaining momentum and this become preferred choice in tier 1 cities as well to provide last mile connectivity, in sync with multi-modal integration to for door-to-door service. In order to control cost, it is now more and more explored to adopt to At Grade Section in such light transit systems. But at junction of such at grade section with Elevated / Underground stretch, it becomes inevitable to provide transition section. This paper aims in elaborating approach to design such transition zone for trackwork.

Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.