Tests and Inspection for German Bridges with stay cables using prestressing strands according to fib-recommendation

 Tests and Inspection for German Bridges with stay cables using prestressing strands according to fib-recommendation
Auteur(s): ,
Présenté pendant 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008, publié dans , pp. 468-469
DOI: 10.2749/222137908796293596
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.08 MB

In the past all large stay cable bridges in Germany were built with locked wire ropes [1]. For a new project, Ziegelgraben-Bridge crossing the “Strelasound”, the contract award also had allowed off...
Lire plus

Détails bibliographiques

Auteur(s):

Médium: papier de conférence
Langue(s): anglais
Conférence: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008
Publié dans:
Page(s): 468-469 Nombre total de pages (du PDF): 8
Page(s): 468-469
Nombre total de pages (du PDF): 8
DOI: 10.2749/222137908796293596
Abstrait:

In the past all large stay cable bridges in Germany were built with locked wire ropes [1]. For a new project, Ziegelgraben-Bridge crossing the “Strelasound”, the contract award also had allowed offers with stay cables using prestressing strands for tendering. Resulting from the good experience with this bridge a second bridge project with stay cables using prestressing strands, a bridge crossing the river Rhine near Wesel, was charged. Since no supplier had a general approval for these strand stay cables many tests according to the newfib-recommendation had been required [2] [3]. Before executing the bridges with stay cables using prestressing strands special requirements for the life time of the bridge were defined to ensure the durability and sustainability of the structure. The exchangeability of a stay cable as well as of a single strand has to be possible.

The stay cables of the bridge crossing the Strelasund were installed without mishap. For the Rhine-bridge the tests are finished. Since June 2007 the cables have been installed.

Mots-clé:
haubans