Technical risks to major infrastructure development

 Technical risks to major infrastructure development
Auteur(s): ,
Présenté pendant IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018, publié dans , pp. 54-67
DOI: 10.2749/kualalumpur.2018.0054
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.2 MB

There are a number of different classes of risk that must be addressed in the development, execution and operation of any major infrastructure project. Should the proponent fail to address all of t...
Lire plus

Détails bibliographiques

Auteur(s): (Western Sydney University, NSW, Australia)
(Independent Researcher, NSW, Australia)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018
Publié dans:
Page(s): 54-67 Nombre total de pages (du PDF): 14
Page(s): 54-67
Nombre total de pages (du PDF): 14
DOI: 10.2749/kualalumpur.2018.0054
Abstrait:

There are a number of different classes of risk that must be addressed in the development, execution and operation of any major infrastructure project. Should the proponent fail to address all of these risks, the project may be a failure.

In this paper, the Authors discuss technical risks, highlighting cases where the initial formation and composition of the Project Team provided the conditions for failure to occur, sometimes with loss of life.

The Authors will discuss several Australian examples, including the Royal Canberra Hospital demolition, Melbourne’s West Gate Bridge collapse, and also the San Francisco Oakland Bay Bridge construction. In each case, the Authors show that organisational design of the Project Team played a significant part in the technical failures and the consequences. In Canberra Hospital demolition case, that the technical failure resulted in a death, is largely attributable to the design of the Project Team and political interference.

The Authors compare these failures to the successful completion of the Øresund Bridge, identifying those aspects of the Project Team design that ensured a high likelihood of success.