Technical Challenges and Solutions in the Management of the Designs in a Motorway Project
|
Détails bibliographiques
Auteur(s): |
George Konstantinidis
Ioanna Papazioga Ioannis Rentzeperis Efimia Sarridou-Haitidou |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Publié dans: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Page(s): | 36-37 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2007 | ||||
DOI: | 10.2749/222137807796119618 | ||||
Abstrait: |
The management of designs for a large-scale and technically demanding project such as the Egnatia Motorway constructed in Greece is not an easy task. Egnatia Odos A.E. was proactive in making strategic decisions and developing appropriate procedures with the aim to overcome any difficulties in this field and ensure high-quality designs within the time and cost restrictions set by the project. This paper presents the company choices and evaluates their effectiveness. |
||||
Mots-clé: |
design pont contrats tunnel
|