Study on the Self-Balancing System of 2300m Main Span Suspension Bridge and Relative Mechanical Characteristics

 Study on the Self-Balancing System of 2300m Main Span Suspension Bridge and Relative Mechanical Characteristics
Auteur(s): , , , ,
Présenté pendant IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, publié dans , pp. 301-310
DOI: 10.2749/nanjing.2022.0301
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.21 MB

Zhangjinggao Yangtze River Bridge has a main span of 2300 m, and a tower height of 350 m. A huge bending moment at the tower bottom under operation loads would happen if the traditional fixed restr...
Lire plus

Détails bibliographiques

Auteur(s): (CCCC Highway Planning and Design Institute Limited, Beijing, China)
(CCCC Highway Planning and Design Institute Limited, Beijing, China)
(CCCC Highway Planning and Design Institute Limited, Beijing, China)
(CCCC Highway Planning and Design Institute Limited, Beijing, China)
(Southwest Jiaotong University, Sichuan, China)
(Jiangsu Provincial Transportation Engineering Construction Bureau,Jiangsu,China)
(Jiangsu Provincial Transportation Engineering Construction Bureau,Jiangsu,China)
(Jiangsu Provincial Transportation Engineering Construction Bureau,Jiangsu,China)
(Jiangsu Provincial Transportation Engineering Construction Bureau,Jiangsu,China)
(Jiangsu Provincial Transportation Engineering Construction Bureau,Jiangsu,China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Publié dans:
Page(s): 301-310 Nombre total de pages (du PDF): 10
Page(s): 301-310
Nombre total de pages (du PDF): 10
DOI: 10.2749/nanjing.2022.0301
Abstrait:

Zhangjinggao Yangtze River Bridge has a main span of 2300 m, and a tower height of 350 m. A huge bending moment at the tower bottom under operation loads would happen if the traditional fixed restraint system between the saddle and the tower top were adopted. In the actual design, a movable saddle was used as a self-balancing device at the tower top, releasing part of the shear force, thus reducing the bottom bending moment. Due to friction, the movable saddle on the flexible tower complexes the structural calculation model and force transmission mechanism. This study established a computational model of the longitudinal movable saddle to analyze the static response and the mechanical properties including the consideration of the influence of friction. The study shows that the self-balancing system significantly reduced the maximum bending moment at the tower bottom under a vehicle load and/or a temperature load. Whereas this system increased the bending moment of the tower under a longitudinal wind load. Large friction coefficients undermined the effect of the self-balancing system.

Mots-clé:
pont suspendu
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.

Ouvrages et projets