A Study of Construction Optimization in Shallow Bias Tunnel Based on Multi- displacement Back Analysis
|
Détails bibliographiques
Auteur(s): |
LIU Yingqi
ZHANG Xiedong |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Conference: Bridges and Structures Sustainability - Seeking Intelligent Solutions, Guangzhou, China, 8-11 May 2016 | ||||
Publié dans: | IABSE Conference, Guangzhou, China, 8 – 11 May 2016 | ||||
|
|||||
Page(s): | 961-966 | ||||
Nombre total de pages (du PDF): | 6 | ||||
Année: | 2016 | ||||
DOI: | 10.2749/222137816819259374 | ||||
Abstrait: |
ZHANG Xiedong Ph.D Professor Wuhan University of Technology,Hubei, China Zhangxd@189.cn Zhang Xiedong, born 1964, received his civil engineering doctor degree from the Wuhan University of Technology. The main 2D back analysis model is established considering actual situations of the way the arch ring is set and the composition of its section. After introducing the stress release rate and the load bias parameter to composing the integral equation of the influence value, the data of arch crown settlement and horizontal convergence can be used to back analyse the load status of the supporting structure. By changing the modeling parameters, the optimizing construction scheme can be simulated and the most unfavorable stress value is analyzed, which can provide references to similar engineering. |