0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

A Study of Construction Optimization in Shallow Bias Tunnel Based on Multi- displacement Back Analysis

A Study of Construction Optimization in Shallow Bias Tunnel Based on Multi- displacement Back Analysis
Auteur(s): ,
Présenté pendant IABSE Conference: Bridges and Structures Sustainability - Seeking Intelligent Solutions, Guangzhou, China, 8-11 May 2016, publié dans , pp. 961-966
DOI: 10.2749/222137816819259374
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.28 MB

ZHANG Xiedong Ph.D Professor Wuhan University of Technology,

Hubei, China

Zhangxd@189.cn

Zhang Xiedong, born 1964, received his civil engineering doctor degree from the Wuhan Un...
Lire plus

Détails bibliographiques

Auteur(s):

Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Bridges and Structures Sustainability - Seeking Intelligent Solutions, Guangzhou, China, 8-11 May 2016
Publié dans:
Page(s): 961-966 Nombre total de pages (du PDF): 6
Page(s): 961-966
Nombre total de pages (du PDF): 6
Année: 2016
DOI: 10.2749/222137816819259374
Abstrait:

ZHANG Xiedong Ph.D Professor Wuhan University of Technology,

Hubei, China

Zhangxd@189.cn

Zhang Xiedong, born 1964, received his civil engineering doctor degree from the Wuhan University of Technology.

The main 2D back analysis model is established considering actual situations of the way the arch ring is set and the composition of its section. After introducing the stress release rate and the load bias parameter to composing the integral equation of the influence value, the data of arch crown settlement and horizontal convergence can be used to back analyse the load status of the supporting structure. By changing the modeling parameters, the optimizing construction scheme can be simulated and the most unfavorable stress value is analyzed, which can provide references to similar engineering.