0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Structural steel maintenance and rehabilitation methods of current Canadian infrastructure

 Structural steel maintenance and rehabilitation methods of current Canadian infrastructure
Auteur(s):
Présenté pendant IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, publié dans , pp. 216-217
DOI: 10.2749/222137807796120355
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.69 MB

Engineers choose steel based on its durability, ease of maintenance, proven lifecycle performance and versatility in highways and infrastructure applications. This paper will report on various type...
Lire plus

Détails bibliographiques

Auteur(s):
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007
Publié dans:
Page(s): 216-217 Nombre total de pages (du PDF): 8
Page(s): 216-217
Nombre total de pages (du PDF): 8
Année: 2007
DOI: 10.2749/222137807796120355
Abstrait:

Engineers choose steel based on its durability, ease of maintenance, proven lifecycle performance and versatility in highways and infrastructure applications. This paper will report on various types and sizes of public infrastructure in Canada with an emphasis on bridges. The focus will be on the maintenance and rehabilitation of steel bridges. Public infrastructure in Canada that has undergone maintenance and rehabilitation will be identified. Projects include the Lion’s Gate Bridge in Vancouver, BC, and the MacKay and MacDonald Bridges in Halifax, Nova Scotia. Canadian Public Works departments and others in charge of handling maintenance have been the major source of information in this investigation. Also included in the scope of this paper is how infrastructure is assessed in terms of the extent to which maintenance is needed.

Maintenance can take either the form of preventive or reactive maintenance. Preventive maintenance practices are proactive actions, such as inspections and servicing. Reactive maintenance takes place after damage has occurred to repair or replace deteriorated components. Regular maintenance includes yearly activities such as cleaning out expansion joints in bridges, patching holes in the asphalt and clearing curbs of sand and salt accumulated from winter ice and snow control. The paper will give a comprehensive overview of the state-of-the-art methods and practice of maintenance and rehabilitation for bridges in Canada.

Mots-clé:
ponts en acier