0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Strengthening of road composite bridge using Fe-SMA

 Strengthening of road composite bridge using Fe-SMA
Auteur(s): , , ,
Présenté pendant IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, publié dans , pp. 837-844
DOI: 10.2749/prague.2022.0837
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.16 MB

Exceeding creep actions on newly built composite bridge in Karlovy Vary led to rapid repair works of the excessively deflected structure. Activation of retrofit prestressing system in confined plac...
Lire plus

Détails bibliographiques

Auteur(s): (Czech Technical University in Prague, Faculty of Civil Engineering, Thákurova 7, 166 29 Prague, Czech Republic)
(Czech Technical University in Prague, Faculty of Civil Engineering, Thákurova 7, 166 29 Prague, Czech Republic)
(Empa, Swiss Federal Laboratories for Material Science and Technology, Überlandstrasse 129, CH- 8600 Dübendorf, Switzerland)
(ISISE, University of Minho, Department of Civil Engineering, 4800-058 Guimaraes, Portugal)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Publié dans:
Page(s): 837-844 Nombre total de pages (du PDF): 8
Page(s): 837-844
Nombre total de pages (du PDF): 8
DOI: 10.2749/prague.2022.0837
Abstrait:

Exceeding creep actions on newly built composite bridge in Karlovy Vary led to rapid repair works of the excessively deflected structure. Activation of retrofit prestressing system in confined places is usually a difficult task. Instead of space-demanding hydraulic actuators, prestressing system of thermally activated shape memory alloys was used under low filler beam bridge to act against the creep inflicted deflection. Method of thermal activation of Fe-SMA with use of heating ceramic pads with resistance wire was performed on all of 17 filler beams. This method was proven as most suitable for field activation in previous application. Strengthening was done in February 2021 without any intervention into the traffic on the bridge. It is the first permanent Fe-SMA application of its kind in the world. Wireless monitoring of the bridge started before the prestress activation and continued for several months. Static load test with use of 32-ton trucks was conducted. Based on the long-term monitoring, the relaxation of Fe-SMA is evaluated and compared with the results from the experimental analysis conducted in laboratory conditions on the same retrofit system.

Mots-clé:
renforcement
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.