0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Strengthening of Riveted Connections of a Steel Arch Bridge: Lessons Learned

 Strengthening of Riveted Connections of a Steel Arch Bridge: Lessons Learned
Auteur(s): ,
Présenté pendant IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, publié dans , pp. 1588-1595
DOI: 10.2749/stockholm.2016.1583
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.27 MB

As part of an extensive renovation program, Arup Netherlands delivered engineering services for the strengthening and renovation of 8 large steel bridges in the Dutch highway network. Strengthening...
Lire plus

Détails bibliographiques

Auteur(s): (Ove Arup and Partners, Edinburgh, UK (formerly Arup Netherlands))
(TNO, Delft, The Netherlands (formerly Arup Netherlands))
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Publié dans:
Page(s): 1588-1595 Nombre total de pages (du PDF): 8
Page(s): 1588-1595
Nombre total de pages (du PDF): 8
Année: 2016
DOI: 10.2749/stockholm.2016.1583
Abstrait:

As part of an extensive renovation program, Arup Netherlands delivered engineering services for the strengthening and renovation of 8 large steel bridges in the Dutch highway network. Strengthening of the riveted splice connections at the ends of the hangers of a steel arch bridge on the Dutch A2 motorway represented a significant challenge to extending its life by 30 years.

This paper describes the key features of and lessons learned during assessments, investigations, design development and execution of a strengthening solution to resolve the issue.

Mots-clé:
pont en acier renforcement

Ouvrages et projets

Types d'ouvrages

Lieux géographiques