0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Stonecutters Bridge – Main Span Erection

 Stonecutters Bridge – Main Span Erection
Auteur(s): , , , ,
Présenté pendant 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008, publié dans , pp. 402-403
DOI: 10.2749/222137908796293208
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.09 MB

Stonecutters Bridge is a cable-stayed bridge which will span the Rambler Channel in Hong Kong above the busy shipping channel. Construction commenced in early 2004 and the bridge is scheduled to ...
Lire plus

Détails bibliographiques

Auteur(s):




Médium: papier de conférence
Langue(s): anglais
Conférence: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008
Publié dans:
Page(s): 402-403 Nombre total de pages (du PDF): 8
Page(s): 402-403
Nombre total de pages (du PDF): 8
Année: 2008
DOI: 10.2749/222137908796293208
Abstrait:

Stonecutters Bridge is a cable-stayed bridge which will span the Rambler Channel in Hong Kong above the busy shipping channel. Construction commenced in early 2004 and the bridge is scheduled to be open to traffic in mid-2009. Steel deck segments in the main span are lifted from a dynamically positioned barge using lifting frames with high capacity winches to minimise the lifting time. Stay cables are the prefabricated parallel wire type, delivered to site on large reels. The unreeling and lifting procedures ensure the bending radius of the cables is kept above the minimum allowed. Stressing to predetermined installation length is by large hydraulic jack beneath deck level. Cable forces are calculated from the frequencies, measured by accelerometers. At the end of each erection cycle, surveys of the bridge geometry are compared with the predicted deflections for that stage and any adjustments calculated. Main span closure will follow towards the end of 2008.

Mots-clé:
Pont à haubans haubans

Ouvrages et projets