0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

A stayed footbridge in the access to Ferrol Port

Auteur(s):
Médium: papier de conférence
Langue(s): anglais
Conférence: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014
Publié dans:
Année: 2014
Abstrait:

This article describes the design and construction of an eccentrically stayed steel footbridge, built between the years 2009 – 2010 in access to the Port of Ferrol in Spain.

The footbridge named “AS” is a steel deck with S-shaped plan development of 205 meters. The main span, 60 meters long, and the two compensating spans are suspended off a set of eccentric stays that extend from one edge of the deck up to two leaned metallic pylons that will be the future gateway to the Port .

The deck, 3,768 meters wide, has a wooden platform of IPÉ wood, 2,40 meters wide, leaving empty spaces on both sides, making visible the steel structure, which consists of a metal tube, with cantilever beams of variable depths, attached to the opposite end by a smaller diameter tube. The deck is stiffened in plan with small diagonal tubes in tension.

The deck, therefore, presents great lightness and elegance that can only be surpassed by structures with stress ribbon typlology.

Mots-clé:
esthétique acier design passerelle structure

Ouvrages et projets

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant.
  • Informations
    sur cette fiche
  • Reference-ID
    10070836
  • Publié(e) le:
    09.12.2014
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine