0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Some proposals for the Highway Bridge Design System improvement, aimed at increasing of maintenance and rehabilitation efficiency

 Some proposals for the Highway Bridge Design System improvement, aimed at increasing of maintenance and rehabilitation efficiency
Auteur(s):
Présenté pendant IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, publié dans , pp. 1463-1468
DOI: 10.2749/stockholm.2016.1458
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.19 MB

This article revises the existing Highway Bridge Design System. The traditional and improved approaches dealing with bridge life cycle are considered. Shown, that success depends primarily on decis...
Lire plus

Détails bibliographiques

Auteur(s): (PLC Transmost, St. Petersburg, Russia)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Publié dans:
Page(s): 1463-1468 Nombre total de pages (du PDF): 6
Page(s): 1463-1468
Nombre total de pages (du PDF): 6
Année: 2016
DOI: 10.2749/stockholm.2016.1458
Abstrait:

This article revises the existing Highway Bridge Design System. The traditional and improved approaches dealing with bridge life cycle are considered. Shown, that success depends primarily on decisions taken at the design stage. Some results of bridge inspections in Russia are presented. The examples of technical and organizational solutions improving are given. The paper spotlights that retrofitting of the existing Design System must be based on feedback from the operation process. Systematization of data from operation of similar facilities, risk analysis, development of routine and heavy maintenance plans, inspection plans and health monitoring systems should start from very beginning of design process. Example of contradiction between design and operation is presented. It’s suggested to create the Data Base, containing the information concerning structures, ineffective in terms of safety and long service life of highway bridges.

Mots-clé:
cycle de vie