The smart FRP panel for bridge redecking – development and experimental validation of "panel – panel" and "panel – girder" connections

The smart FRP panel for bridge redecking – development and experimental validation of "panel – panel" and "panel – girder" connections
Auteur(s): , ,
Présenté pendant IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, publié dans , pp. 1087-1095
DOI: 10.2749/newdelhi.2023.1087
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 1.1 MB

The paper presents the smart FRP deck system, called Optideck, which was developed as a sandwich panel in which the core is ribbed by a vertical laminates forming a honeycomb structure. The panel i...
Lire plus

Détails bibliographiques

Auteur(s): (Rzeszow University of Technology, Rzeszow, Poland)
(Rzeszow University of Technology, Rzeszow, Poland)
(Rzeszow University of Technology, Rzeszow, Poland)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Publié dans:
Page(s): 1087-1095 Nombre total de pages (du PDF): 9
Page(s): 1087-1095
Nombre total de pages (du PDF): 9
DOI: 10.2749/newdelhi.2023.1087
Abstrait:

The paper presents the smart FRP deck system, called Optideck, which was developed as a sandwich panel in which the core is ribbed by a vertical laminates forming a honeycomb structure. The panel is equipped with distributed fibre optic sensors for structural health monitoring. The sensors are built into the panel during the infusion process and fully integrated with the structure. Taking into account the design and transport constraints, the final parts of the deck slab have to be connected longitudinally or transversely on site, which is quite a challenge due to the irregular form of the ribbed core. The panel has to be also efficiently attached to the main girders of the bridge. The paper presents the stages of creating the concept of panel-panel and panel-concrete and steel girder connections, their design, production of prototypes and finally their static and fatigue tests in the laboratory. The conclusions drawn from the individual stages led to the selection of the best solution and its use in the future in the final deck panels.