Slide and Turn Gracefully and Economically – A Tale of Four Bridges

 Slide and Turn Gracefully and Economically – A Tale of Four Bridges
Auteur(s):
Présenté pendant IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, publié dans , pp. 2711-2718
DOI: 10.2749/stockholm.2016.2710
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.18 MB

A mechanical opening bridge brings to the art of bridge design the fourth dimension – time, and with it the visual excitement of movement. In terms of cost, in the context of navigation clearances,...
Lire plus

Détails bibliographiques

Auteur(s): (Studio Bednarski Ltd( architects ) London, UK)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Publié dans:
Page(s): 2711-2718 Nombre total de pages (du PDF): 8
Page(s): 2711-2718
Nombre total de pages (du PDF): 8
Année: 2016
DOI: 10.2749/stockholm.2016.2710
Abstrait:

A mechanical opening bridge brings to the art of bridge design the fourth dimension – time, and with it the visual excitement of movement. In terms of cost, in the context of navigation clearances, it can offer savings over a high clearance fixed bridge with its ramps and approaches. An opening bridge can be designed to have a minimal impact on, for example, a historic urban context. This paper presents 4 openable bridges designed by the author with teams of engineers. Two of them, Copenhagen ( sliding ) and Gdansk ( turning ), both set in a protected urban context, were competition winners. Two examples in London were studies for Transport for London (TFL), the London transport authority. The recently completed Copenhagen bridge took years to build mainly due to client’s weaknesses in the process of managing its procurement and construction. As such it offers useful lessons. This paper presents some aspects of its design and construction process. The competition winning turning bridge in Gdansk is at detailed design stage and is yet to be built. There are no immediate plans to advance any of the two London bridge concepts.

Mots-clé:
pont

Ouvrages et projets