0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Shear Capacity of Concrete Beams under Sustained Loading

 Shear Capacity of Concrete Beams under Sustained Loading
Auteur(s): , , ,
Présenté pendant IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, publié dans , pp. 88-89
DOI: 10.2749/222137813806474264
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.21 MB

Long-term tests on large-scale concrete beams without shear reinforcement, which are tested for more than two years under sustained loading close to the ultimate shear capacity (load ratio ranging ...
Lire plus

Détails bibliographiques

Auteur(s):



Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Publié dans:
Page(s): 88-89 Nombre total de pages (du PDF): 8
Page(s): 88-89
Nombre total de pages (du PDF): 8
Année: 2013
DOI: 10.2749/222137813806474264
Abstrait:

Long-term tests on large-scale concrete beams without shear reinforcement, which are tested for more than two years under sustained loading close to the ultimate shear capacity (load ratio ranging from 87% to 95%) under climate controlled condition, show that sustained loading has no significant effect on the shear capacity. Although many flexural and shear cracks develop, the beams carry the load for a long time. The tests show that crack formation takes place only within some days after the load application, but after a week the cracks stabilize and become dormant.