0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Seismic Retrofit of an Aged, Historic Signature Concrete Bridge

 Seismic Retrofit of an Aged, Historic Signature Concrete Bridge
Auteur(s): ,
Présenté pendant 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008, publié dans , pp. 364-365
DOI: 10.2749/222137908796292984
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.11 MB

The Cabrillo Bridge was constructed in 1914 for the Panama-California Exposition of 1915. The existing structure consists of eight independent cantilever spans with a total structure length of 479’...
Lire plus

Détails bibliographiques

Auteur(s):

Médium: papier de conférence
Langue(s): anglais
Conférence: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008
Publié dans:
Page(s): 364-365 Nombre total de pages (du PDF): 10
Page(s): 364-365
Nombre total de pages (du PDF): 10
Année: 2008
DOI: 10.2749/222137908796292984
Abstrait:

The Cabrillo Bridge was constructed in 1914 for the Panama-California Exposition of 1915. The existing structure consists of eight independent cantilever spans with a total structure length of 479’ and a maximum structure height of approximately 129’. For each independent span there are two twelve foot square hollow columns with unique detailing features. Inspection of the existing condition revealed a significantly deteriorated existing condition of the structure with a variety of steel and concrete issues. A major rehabilitation effort is first required to bring the condition of the existing structure to an acceptable level. Seismic analyses on the assumed rehabilitated structure

revealed the structure is severely deficient in shear and displacement capacity as well as a variety of detailing issues. To resolve many of the issues, the eight independent spans will be tied together with full length, unbonded post-tensioning. Furthermore, inside each column supplemental shear walls will be constructed and the columns will be post-tensioned.

These retrofit details are expected to produce a structure that is capable of withstanding the design level earthquake demands in line with life-safety criterion.

Fig. 1: Bridge Construction, circa 1915

Mots-clé:
pont historique retrofit