Risk Management for Construction of a Mega Project in Kuwait

 Risk Management for Construction of a Mega Project in Kuwait
Auteur(s): ,
Présenté pendant IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, publié dans , pp. 132-141
DOI: 10.2749/stockholm.2016.0132
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.2 MB

Mega construction projects are extremely large-scale investment projects that typically cost more than one billion dollars, requiring resources that run into millions of man hours, with numerous st...
Lire plus

Détails bibliographiques

Auteur(s): (Kuwait Institute for Scientific Research, Kuwait)
(Manchester Metropolitan University, Manchester, UK)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Publié dans:
Page(s): 132-141 Nombre total de pages (du PDF): 10
Page(s): 132-141
Nombre total de pages (du PDF): 10
Année: 2016
DOI: 10.2749/stockholm.2016.0132
Abstrait:

Mega construction projects are extremely large-scale investment projects that typically cost more than one billion dollars, requiring resources that run into millions of man hours, with numerous stakeholders with an extraordinary amount of interlink. Megaprojects take five years or more to complete and generate high public attention, generates multiple social impact and environmental impact, and high investments by governments. These factors introduce complexities and other unclear risks upon execution. Historical data shows very poor performance for megaprojects. In particular they are often over-budgeted and/or behind schedule and, once finished, they deliver less benefits than originally planned. ‘Megaprojects’ is a concept of growing importance in Kuwait’s construction industry nowadays and is a globally connected business environment. This concept requires closer examination as a result of the expansion of global networks, increasing collaboration among numerous partners and the complexity of managing such projects. Despite the existing research in megaprojects, it is still unclear what risks are associated with these types of projects and which project characteristics promote the delivery of successful megaprojects. It is critical to examine the risks associated with implementation and to identify the factors that contribute to success of megaprojects. This research aims to identifying and assessing essential risks variables associated with construction of megaproject in Kuwait and in developing strategies to manage and mitigate them.