0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Retrofitting of AYALA Bridge, an historic steel bridge in Manilla (Philippines)

 Retrofitting of AYALA Bridge, an historic steel bridge in Manilla (Philippines)
Auteur(s): , , ,
Présenté pendant IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, publié dans , pp. 653-659
DOI: 10.2749/stockholm.2016.0632
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.26 MB

Ayala Bridge, in the center of Manilla, is a steel arch bridge built in the 1950s. It is comprised of 2 simply supported steel bridges constructed with 3 trusses connected together. The bridge has ...
Lire plus

Détails bibliographiques

Auteur(s): (Freyssinet International, Rueil-Malmaison, FRANCE)
(Freyssinet International, Rueil-Malmaison, FRANCE)
(Freyssinet International, Rueil-Malmaison, FRANCE)
(Freyssinet International, Rueil-Malmaison, FRANCE)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Publié dans:
Page(s): 653-659 Nombre total de pages (du PDF): 7
Page(s): 653-659
Nombre total de pages (du PDF): 7
Année: 2016
DOI: 10.2749/stockholm.2016.0632
Abstrait:

Ayala Bridge, in the center of Manilla, is a steel arch bridge built in the 1950s. It is comprised of 2 simply supported steel bridges constructed with 3 trusses connected together. The bridge has to be retrofitted for conformity to new codes (traffic and seismic) and lifted by 70 cm for conformity to regulatory clearance. The retrofitting solution designed by Freyssinet was chosen because of its economy when considering both deck and foundations: it consists of minimizing the current seismic loads on piers and abutments, to get them lower than actual loads seen in the past under historic seismic and typhoon. Longitudinally, the 2 decks are linked together and extended with beams and new piles: the overall structure is working as a frame. Transversally, some seismic devices are placed. The overall steel structure is then strengthened using additional steel profiling and prestressing. Major parts of the work has been done with no traffic interruption at all.

Mots-clé:
levage de charges lourdes pont en acier renforcement

Ouvrages et projets

Lieux géographiques