0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Restoration and Conversion of a Historic Building into a New Learning Park

 Restoration and Conversion of a Historic Building into a New Learning Park
Auteur(s):
Présenté pendant IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, publié dans , pp. 2492-2499, 2521-2528
DOI: 10.2749/newyork.2019.2492
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.24 MB

In 2013, a local government official in Nakhon Ratchasima Province, Thailand undertook a project to restore a two‐story building in a historic zone. The 976‐square‐meter building was converted into...
Lire plus

Détails bibliographiques

Auteur(s): (FSE Consultant Co.,Ltd.)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Publié dans:
Page(s): 2492-2499, 2521-2528 Nombre total de pages (du PDF): 8
Page(s): 2492-2499, 2521-2528
Nombre total de pages (du PDF): 8
DOI: 10.2749/newyork.2019.2492
Abstrait:

In 2013, a local government official in Nakhon Ratchasima Province, Thailand undertook a project to restore a two‐story building in a historic zone. The 976‐square‐meter building was converted into a learning park for the general public. Architects and engineers collaborated on the project following precise procedures, ensuring most of the original features and significant structures were preserved. The main steps involved a survey and safety evaluation in assessing the choice of design criteria and construction techniques. The building design was analyzed, and significant modifications to the structures were deemed necessary. The structural engineer decided that new steel structures were required both above and below the existing structures to support the new precast concrete slabs which were to be covered by new wooden floors. The new and existing structures were able to maintain their independence because there were sufficient gaps to provide separation between them; this also necessitated the construction of new separate footings as independent support for all the new loads. The new learning park opened in 2017.