The Research of Multi-Resource Equilibrium Optimization in Schedule Management
Auteur(s): |
Yun Ning Zhang
Wei Wei Chen |
---|---|
Médium: | papier de conférence |
Langue(s): | anglais |
Conférence: | 2012 International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2012), August 10-12th 2012, Zhangjiajie (China) |
Publié dans: | Sustainable Cities Development and Environment [3 vols] |
Page(s): | 1406-1410 |
DOI: | 10.4028/www.scientific.net/AMM.209-211.1406 |
Abstrait: |
Resource equilibrium optimization is a typical problem in Schedule Management. Based on studying multi-resource equilibrium theory thoroughly, this paper firstly gives different weights to various resources by using fuzzy comprehensive evaluation to transform multi-objective problem to single objective problem. Then, it establishes a model for multi-resource equilibrium optimization by choosing the variance of various resources’ demands as objective function. Finally, this paper describes its basic principle and steps, which has important theoretical significance. |
- Informations
sur cette fiche - Reference-ID
10327247 - Publié(e) le:
24.07.2019 - Modifié(e) le:
24.07.2019