Replacing damaged PSC Suspended span of Varsova Bridge across Vasai Creek on NH-8, Mumbai, India.

 Replacing damaged PSC Suspended span of Varsova Bridge across Vasai Creek on NH-8, Mumbai, India.
Auteur(s): , ,
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 3214-3221
DOI: 10.2749/222137817822208807
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.21 MB

The existing Varsova Bridge across Vasai Creek, called as Bassein Creek Bridge when constructed, was opened to traffic in 1968. It is in Mumbai Ahmedabad section of NH-48, about 35 Km from Mumbai. ...
Lire plus

Détails bibliographiques

Auteur(s): (Director, IRB Infrastructure Developers Ltd., Mumbai, India)
(VP Design, IRB Infrastructure Developers Ltd., Mumbai, India)
(Technical Manager, IRB Infrastructure Developers Ltd., Mumbai, India)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 3214-3221 Nombre total de pages (du PDF): 8
Page(s): 3214-3221
Nombre total de pages (du PDF): 8
Année: 2017
DOI: 10.2749/222137817822208807
Abstrait:

The existing Varsova Bridge across Vasai Creek, called as Bassein Creek Bridge when constructed, was opened to traffic in 1968. It is in Mumbai Ahmedabad section of NH-48, about 35 Km from Mumbai. Major cracks were noticed in the West side girder of the penultimate span from Mumbai end on 12th December 2013. The site was inspected for assessment of the damage. It was decided to replace the said span with composite steel girder. The real task was to dismantle the existing PSC span without any debris falling in the creek while working in a very restricted work area as well as within a very short period. This paper discusses the replacement done, deliberating about the constraints imposed from the design, construction and situation; formulating replacement scheme; design of new structure; dismantling the damaged PSC span and its replacement with composite deck i.e. steel girders and concrete deck slab.