0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Replacement of the Viaduct of Marly Le Roi

 Replacement of the Viaduct of Marly Le Roi
Auteur(s): ,
Présenté pendant IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, publié dans , pp. 902-906
DOI: 10.2749/newyork.2019.0902
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.17 MB

The viaduct of Marly Le Roi was built in 1884 between the railway stations of Saint-Cloud and Saint-Nom-la- Bretèche. During that time, the French engineer Gustave Eiffel (later known for its tower...
Lire plus

Détails bibliographiques

Auteur(s): (Freyssinet International & Cie)
(Freyssinet International & Cie)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Publié dans:
Page(s): 902-906 Nombre total de pages (du PDF): 5
Page(s): 902-906
Nombre total de pages (du PDF): 5
DOI: 10.2749/newyork.2019.0902
Abstrait:

The viaduct of Marly Le Roi was built in 1884 between the railway stations of Saint-Cloud and Saint-Nom-la- Bretèche. During that time, the French engineer Gustave Eiffel (later known for its tower) had largely encountered successes with the design and construction of riveted puddled iron structures. Belonging to these types of structures, the viaduct of Marly Le Roi is carrying more than 16.000 travelers every day.

Lately, the demand in transportation lead the client (SNCF) to increase the capacity of their suburban trains. The bridge could not be retrofitted for these new loads. In addition, the expansion of the city under the structure was raising issues such as noise reduction that could not be answered by the client due to the structure type. Therefore, it has been chosen to replace this historical monument by a composite twin-girder bridge.

The new structure was designed by Baudin Châteauneuf. The design and operations to move the two structures and dismantle the existing bridge were carried out by Freyssinet.

Mots-clé:
levage de charges lourdes

Ouvrages et projets

Lieux géographiques