The relocation of a heritage bridge
|
Détails bibliographiques
Auteur(s): |
Paul Hogesteeger
(Royal HaskoningDHV, Department Transport & Planning, Rotterdam, The Netherlands)
Rob Vergoossen (Royal HaskoningDHV, Department Transport & Planning, Rotterdam, The Netherlands) Marc Bruchner (Municipality of Amsterdam, Engineering Department, Amsterdam, The Netherlands) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021 | ||||
Publié dans: | IABSE Congress Ghent 2021 | ||||
|
|||||
Page(s): | 166-174 | ||||
Nombre total de pages (du PDF): | 9 | ||||
DOI: | 10.2749/ghent.2021.0166 | ||||
Abstrait: |
This paper describes the history of a heritage bridge in Amsterdam (The Netherlands) and the efforts made for the relocation of this bridge. Investigations were made to determine the structural integrity of the original elements and structural assessments were done to find the remaining capacity for future use. The Ultimate Limit State for the original elements was investigated. Lateral stability was checked and based on the historical use and the required future use the fatigue loads were calculated for the different cross sections and for critical connections. These calculations showed that a required residual service life of 30 years after relocation was technically possible for this bridge. Some pros and cons for the re-use of this bridge are also discussed. |
||||
Mots-clé: |
histoire de la construction pont mobile
|
||||
Copyright: | © 2021 International Association for Bridge and Structural Engineering (IABSE) | ||||
License: | Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits. |