0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Rehabilitation of a 200 m long pedestrian bridge with carbon textile reinforced concrete

 Rehabilitation of a 200 m long pedestrian bridge with carbon textile reinforced concrete
Auteur(s): , , , ORCID,
Présenté pendant IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021, publié dans , pp. 101-108
DOI: 10.2749/ghent.2021.0101
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.21 MB

The pedestrian and cyclist bridge Rheinsteg of the Rheinkraftwerk Albbruck-Dogern AG (RADAG) constructed in 1934 was on the verge of demolition due to severe corrosion damage. Replacing the ...
Lire plus

Détails bibliographiques

Auteur(s): (Institute of Structural Concrete, RWTH Aachen University, Aachen, Germany)
(Institute of Structural Concrete, RWTH Aachen University, Aachen, Germany)
(Institute of Structural Concrete, RWTH Aachen University, Aachen, Germany)
ORCID (Institute of Structural Concrete, RWTH Aachen University, Aachen, Germany)
(University of Applied Sciences, Augsburg, Germany)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021
Publié dans:
Page(s): 101-108 Nombre total de pages (du PDF): 8
Page(s): 101-108
Nombre total de pages (du PDF): 8
DOI: 10.2749/ghent.2021.0101
Abstrait:

The pedestrian and cyclist bridge Rheinsteg of the Rheinkraftwerk Albbruck-Dogern AG (RADAG) constructed in 1934 was on the verge of demolition due to severe corrosion damage. Replacing the defective slab with seven-centimeter thin carbon textile reinforced concrete allowed to maintain the self-weight and to reuse the existing main steel girders, bridge pillars, and foundations. This rehabilitation process globally saved time and cost compared to a new construction. As the existing steel superstructure was again connected monolithically to the new slab to maintain the same level of serviceability, full vertical cracking as well as loads from shrinkage and differential temperature caused by constraint were to be expected. The influence of vertical cracks and tension forces on shear capacity of TRC was investigated during the approval process. This paper presents the project with a focus on TRC and explains insights from the challenging construction on site.

Mots-clé:
pont
Copyright: © 2021 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.