Rehabilitation and Strengthening of Bridges over Boa Vista River

 Rehabilitation and Strengthening of Bridges over Boa Vista River
Auteur(s): , ,
Présenté pendant IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, publié dans , pp. 1172-1179
DOI: 10.2749/prague.2022.1172
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.13 MB

This work presents the analysis, strengthening and structural rehabilitation of the Bridges over Boa Vista River (North and South lanes on a Highway in the south of Brazil), due to a fire accident ...
Lire plus

Détails bibliographiques

Auteur(s): (Casagrande Engenharia, Rio de Janeiro, RJ, Brazil)
(Casagrande Engenharia, Rio de Janeiro, RJ, Brazil)
(Casagrande Engenharia, Rio de Janeiro, RJ, Brazil)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Publié dans:
Page(s): 1172-1179 Nombre total de pages (du PDF): 8
Page(s): 1172-1179
Nombre total de pages (du PDF): 8
DOI: 10.2749/prague.2022.1172
Abstrait:

This work presents the analysis, strengthening and structural rehabilitation of the Bridges over Boa Vista River (North and South lanes on a Highway in the south of Brazil), due to a fire accident caused by a fuel tanker truck explosion. After the accident, both bridges were blocked and the traffic was diverted to secondary roads, leading to major inconvenience to the users and roads administration. Initially a new structure construction was considered, given the apparent damage caused by the large fire. After inspections, laboratory tests and structural analysis, it was concluded that it would be possible to recover the existing structure with the strengthening in specific regions and conduct a load test on the most affected areas. The collaborative work between the Highway operations, inspection team, contractors and structural engineers has reduced the expected reopening time of both bridges from 6 to less than 2 months.

Mots-clé:
ponts renforcement
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.