Reconstruction of the Vilemov Viaduct on the railway line Rumburk - Sebnitz

 Reconstruction of the Vilemov Viaduct on the railway line Rumburk - Sebnitz
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, publié dans , pp. 1265-1269
DOI: 10.2749/prague.2022.1265
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.2 MB

On the railway track from Rumburk to Sebnitz, near the village Vilémov u Šluknova, there is a seven- span bridge structure with a total length of 217.3 m. In the first half of 2021, five bridge spa...
Lire plus

Détails bibliographiques

Auteur(s): (FIRESTA-Fišer, rekonstrukce, stavby a. s., Brno, Czech Republic)
(FIRESTA-Fišer, rekonstrukce, stavby a. s., Brno, Czech Republic)
(FIRESTA-Fišer, rekonstrukce, stavby a. s., Brno, Czech Republic)
(FIRESTA-Fišer, rekonstrukce, stavby a. s., Brno, Czech Republic)
(FIRESTA-Fišer, rekonstrukce, stavby a. s., Brno, Czech Republic)
(FIRESTA-Fišer, rekonstrukce, stavby a. s., Brno, Czech Republic)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Publié dans:
Page(s): 1265-1269 Nombre total de pages (du PDF): 5
Page(s): 1265-1269
Nombre total de pages (du PDF): 5
DOI: 10.2749/prague.2022.1265
Abstrait:

On the railway track from Rumburk to Sebnitz, near the village Vilémov u Šluknova, there is a seven- span bridge structure with a total length of 217.3 m. In the first half of 2021, five bridge spans of the original riveted steel structures from 1904, which was at the end of its service life, were replaced by welded steel truss bridge superstructures.

Two remaining adjacent arched spans were also part of the renovation and their stone arches were rehabilitated as part of this process.

The outermost stone arches have a span of 7.00 m and the span of each of the five inner steel truss superstructures is 36.80 m.

The bridge crosses the Vilemov Brook valley and at its highest point it stands 34.20 m above the existing terrain. The height of the bridge in particular, combined with an unfavourable course of the terrain below the bridge, was the reason for the chosen erection procedure - a combination of longitudinal launching and lowering onto the bridge piers through a set of temporary structures.

FIRESTA, as the leading participant of the association of companies "Společnost – most přes Karolinino údolí", is the supplier of production and assembly documentation for the whole bridge and manufacturer of three out of five of the aforementioned new steel superstructures. In total about 581 t of structural steel was used for the production of all five steel spans.

Mots-clé:
pont en acier
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.