0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

The Rebuilding of the Harchies Bridge

The Rebuilding of the Harchies Bridge
Auteur(s): ,
Présenté pendant IABSE Conference: Bridges and Structures Sustainability - Seeking Intelligent Solutions, Guangzhou, China, 8-11 May 2016, publié dans , pp. 335-342
DOI: 10.2749/222137816819258627
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.23 MB

The new Harchies Bridge, spanning 68 m, replaces a prestressed concrete bridge built in the 1950’s during the construction of the Nimy-Blaton Canal near Mons, Belgium.

The new structure is an...
Lire plus

Détails bibliographiques

Auteur(s):

Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Bridges and Structures Sustainability - Seeking Intelligent Solutions, Guangzhou, China, 8-11 May 2016
Publié dans:
Page(s): 335-342 Nombre total de pages (du PDF): 8
Page(s): 335-342
Nombre total de pages (du PDF): 8
Année: 2016
DOI: 10.2749/222137816819258627
Abstrait:

The new Harchies Bridge, spanning 68 m, replaces a prestressed concrete bridge built in the 1950’s during the construction of the Nimy-Blaton Canal near Mons, Belgium.

The new structure is an integral abutment bowstring bridge spanning 68 m over the canal. It is supported on two cantilevered concrete abutments that are structurally continuous with the bridge superstructure. Each end of the steel arch is connected to the concrete abutment using very high- strength anchor bars.

The edges of the 13.4 m wide deck are covered with a steel plate. This plate, continuous over the entire length of the bridge, acts, with the slab, to carry the tensile forces which counteract the arch thrust. The plate also supports the structure of the stainless steel net railing. The deck consists of a variable height concrete slab supported every 5 m by transverse steel members. These members, formed with variable height welded steel box sections, work compositely with the concrete slab and transfer the loads from the deck to the hangers. The hangers are plain steel bars, galvanized and painted. They are connected to the deck edge plate at the bottom and to the interior web of the arch at the top.

As the structure is an integral abutment bridge expansion joints are not needed between the deck and the abutments. This typology improves the overall performance of the structure and, more specifically, increases its durability. However, the structural design of the bridge needs to take into account the soil-structure interactions resulting from horizontal displacements related to shrinkage, creep and thermal effects.

Since the chosen structural typology was the first of its kind in Wallonia, the structure was instrumented to monitor its behavior over time: stress gauges have been installed in the hangers and the arches, along with temperature sensors for ambient air and steel, and inclinometers and pressure sensors at the abutments.

Mots-clé:
pont structure

Ouvrages et projets