Pushing the limits of U shaped viaducts
|
Détails bibliographiques
Auteur(s): |
Yves Gauthier
Serge Montens Rajan Kataria Arezki Touat |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Publié dans: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Page(s): | 168-169 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2007 | ||||
DOI: | 10.2749/222137807796120094 | ||||
Abstrait: |
The Pragati-Maidan viaduct is an extradosed railway bridge with a main span of 93 m. The deck cross-section has a U shape, which permits a perfect integration of the metro system in the superstructure. The extradosed cables are covered by a concrete beam that allows to considerm them as internal prestressing. This beam also increases the stiffness of the main span. This bridge is a the first of ist kind to be erected using the cantilever construction method, and it is the first extradosed bridge ever built in India. |
||||
Mots-clé: |
pont ferroviaire extradossé
|