0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Proposal methodology to assess debris current design in traditional Chilean Bridges

 Proposal methodology to assess debris current design in traditional Chilean Bridges
Auteur(s): , , , ,
Présenté pendant IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, publié dans , pp. 165-169
DOI: 10.2749/newyork.2019.0165
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.41 MB

During the last five years, the north of Chile was impacted by several natural disasters not considered in the traditional code design. During 2015 a great rain fall occurred in a desert zone, it i...
Lire plus

Détails bibliographiques

Auteur(s): (Pontificia Universidad Católica de Valparaíso)
(Ministerio de Obras Públicas de Chile)
(Pontificia Universidad Católica de Valparaíso)
(Ministerio de Obras Públicas de Chile)
(Pontificia Universidad Católica de Valparaíso)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Publié dans:
Page(s): 165-169 Nombre total de pages (du PDF): 5
Page(s): 165-169
Nombre total de pages (du PDF): 5
DOI: 10.2749/newyork.2019.0165
Abstrait:

During the last five years, the north of Chile was impacted by several natural disasters not considered in the traditional code design. During 2015 a great rain fall occurred in a desert zone, it is not prepared by this amount of water, producing soil and debris currents from the mountain to the sea (about 100 km).

These phenomena produced an important damage in the infrastructure, specially focused on roads and bridges. The main damage detected was the collapse of the infrastructure (piers and abutment) and the unlinking between deck and piers.

This paper presents a proposal methodology to assess the effect of these currents on bridges, using the case of study of the Chañaral Bridge, a multi-supported bridge, with four concrete girders, slab girder and two spans of 20 meters supported in two abutments and one concrete pier, over the Charañal River.

A sensitive hydraulic analysis via FEM was carried out using non-Newtonian flows (high density) representing the real final topography-condition of the current. A FEM of the bridge was carried out too considering a Non- Linear transient load. The inputs for model are the outputs from the hydraulic model in order to define the condition that produce the same collapse behavior showed after the real debris current.

Finally, results of this methodology are discussed, providing a comprehensive methodology, step by step, in order to obtained similar results according to the 2015 event.

Lieux géographiques