0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Pre-posterior analysis of inspections incorporating degradation of concrete structures

 Pre-posterior analysis of inspections incorporating degradation of concrete structures
Auteur(s): ORCID, ORCID, ORCID, ORCID
Présenté pendant IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, publié dans , pp. 2435-2442
DOI: 10.2749/newyork.2019.2435
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.85 MB

The framework of pre-posterior decision analysis has a large potential as a decision support tool in structural engineering. It seems ideally suited to tackle problems related to determining the va...
Lire plus

Détails bibliographiques

Auteur(s): ORCID (Ghent University)
ORCID (Ghent University)
ORCID (KULeuven)
ORCID (Ghent University)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Publié dans:
Page(s): 2435-2442 Nombre total de pages (du PDF): 8
Page(s): 2435-2442
Nombre total de pages (du PDF): 8
DOI: 10.2749/newyork.2019.2435
Abstrait:

The framework of pre-posterior decision analysis has a large potential as a decision support tool in structural engineering. It seems ideally suited to tackle problems related to determining the value of Structural Health Monitoring and is commonly applied in inspection and maintenance planning. However, the application of this methodology for integrated life-cycle cost decision making related to monitoring of time-dependent and spatial degradation phenomena in concrete structures, needs further investigation. In this work, the time- dependent and spatial degradation phenomena will be coupled to the pre-posterior decision making approach and applied on concrete beams under bending, subjected to corrosion of the reinforcement. A framework is set up to determine the value of information of inspections enabling adequate decision-making. The methodology incorporates Bayesian updating based on the uncertain inspection outcomes. The framework will be illustrated by application on a simply supported reinforced concrete beam.

Mots-clé:
béton