Planning of steel truss web prestressed concrete bridge
Auteur(s): |
Yasuo Inokuma
|
---|---|
Médium: | papier de conférence |
Langue(s): | anglais |
Conférence: | International Conference: Composite Construction - Conventional and Innovative, Innsbruck, Austria, 16-18 September 1997 |
Publié dans: | Composite Construction - Conventional and Innovative |
Année: | 1997 |
DOI: | 10.5169/seals-1101 |
Abstrait: | The Second Tomei Expressway is a new expressway with the length of 320 kilometers linking Tokyo and Nagoya. As one of the new bridge types, a steel truss web prestressed concrete bridge will be constructed. In this paper structural characteristics of this bridge is stated. Construction of the substructure will be starting from 1997. |
- Informations
sur cette fiche - Reference-ID
10542572 - Publié(e) le:
10.01.2021 - Modifié(e) le:
19.02.2021